This past weekend my girlfriend and I installed the flooring in the game room. We're ALMOST DONE! Next steps are to get the gas heat professionally installed. This is scheduled for tomorrow. Once that's done I can have final inspection from the building inspector and I can move in, set up the laser and get back to gaming and painting miniatures. The whole project has taken 2 1/2 months, mostly because I did a lot of the work myself nights and weekends. The sweat equity savings was significant. Doing it myself also means some things were able to be done 'exactly' as I wanted.
I'm looking forward to moving in and getting back to my hobbies. Thanks to everyone for your support.
Overview of Room
Finished Floor