These are photos of the project after two days of work by the carpenters. The walls are lined with rigid foam insulation as a heat and vapor barrier. This is a necessary step here in New Hampshire where that concrete is below freezing part of the year. The room will eventually have a hung ceiling to allow for access to mechanical functions. The space will feature a generous area for a 6'x12' table, with a side area for my painting studio and display cases. I'm hoping to have it all finished in time for the flurry of gaming we all hope to do as vaccinations become the norm. This final photo looks into the painting studio area.
Knights of the Sky Bristol Scout Sheet
3 minutes ago
5 comments:
I am little bit jealous- that looks to be very nice when it is done.
Before the drywall goes up, remember to put one dice (six facing up) in each corner to ward off bad mojo!
Ohhh that's a good idea Ed! Or ones on the side of the table I won't play on much....
Already looking good as one can see some of the direction it's going.
Christopher
That looks like a grand plan AJ. Every gentleman wargamer needs an area to set his troops up...and leave them there for weeks while he contemplates his next turn.
Post a Comment